2024 Griffin 7×16 14K Telescopic Dump Trailer with Ramps and Spare Mount

$5,600.00

New Griffin GT-716/TELE in high-gloss black, rated 14,000 lbs with a 9,145 lb payload. A three-stage telescopic lift tips the bed steeper than a scissor hoist, so wet soil and sticky material actually leave the box, and channel ramps let you load machines.

  • Condition: New
  • Year: 2024
  • Manufacturer / Make: Griffin
  • GVWR: 14,000 lb
  • Quality Verified: Comprehensive multi-point structural & weather-tight inspection
Request a Delivered Quote
  • Delivery from $250.00 in Sacramento – nationwide & international rates at checkout
  • Inspected before dispatch – condition as described
  • Ships in 1–3 business days after payment clears
  • Secure checkout – pay by ACH or wire transfer
Questions about this unit?(279) 272-6346
SKU: BBC-1911 Category:
Description & Specs

Description

A Contractor-Grade Dump Box That Empties Cleanly Every Time

Anyone who has spent ten minutes shovelling wet clay out of a half-tipped dump bed understands why lift design matters. This new 2024 Griffin GT-716/TELE uses a three-stage telescopic cylinder instead of a single scissor hoist, which raises the front of the bed far higher and holds a steeper dump angle right through the cycle. Soaked topsoil, mulch and sticky demolition debris slide out under their own weight rather than packing into the front corners.

The rest of the trailer is built to the same standard. A 14,000 lb GVWR over a 7 ft by 16 ft box leaves 9,145 lbs of payload, the walls and floor are 10-gauge smooth steel on an 80 in. C-channel frame, and the whole thing wears a high-gloss black powder coat that stands up to loading abrasion better than paint. A 12V DC hydraulic pump raises and lowers the bed under power, drawing on a deep cycle marine battery, with the control box mounted up front where you can actually reach it.

At the back, a two-way combination spreader and barn gate gives you a genuine choice at the drop point: swing it wide for a clean pile, or crack the spreader for an even lay-down of gravel as you pull forward.

Specifications

  • 2024 Griffin Trailers, model GT-716/TELE, new, black
  • Three-stage telescopic lift with 12V DC hydraulic pump, power up and power down
  • 10-gauge smooth steel walls and floor on an 80 in. C-channel frame
  • 2 in. x 12 in. wall extension dimension with front and rear gussets
  • Five 5,000 lb D-rings welded into the floor
  • Tarp kit ready with brackets fitted
  • Two-way combination spreader and barn rear gate
  • 2-5/16 in. adjustable coupler and 7,000 lb top-wind drop-leg jack
  • 16 in. radial tires on tandem EZ Lube axles with galvanized components
  • Equalized leaf spring suspension, amber and red LED lighting
  • Fender-mounted adjustable channel ramps and spare tire mount
  • GVWR 14,000 lbs, empty 4,855 lbs, payload 9,145 lbs

Match the rating to the material, not the volume. Sand, wet gravel and broken concrete reach 9,145 lbs long before they fill a 7×16 box, so a full load of dense material is the real test of your tow vehicle and hitch rating rather than a heaped load of brush. The fender-mounted channel ramps turn the same trailer into an equipment hauler for a mini excavator or compact skid steer, and the five floor D-rings are there to chain those machines down properly. On arrival, check tire pressures and put the battery on a charger before the first tip cycle.

Delivery is a flat rate by region from our Sacramento yard – local, nationwide and international – and the exact rate shows at checkout. There is more equipment in the chassis and trailer section, the Big Bear Containers shipping policy sets out how delivery works, and you can request a delivered quote whenever you are ready.

Recommended Applications

  • Commercial & Jobsite Storage: Weatherproof, secure storage for costly tools, building supplies, and inventory.
  • Agricultural & Farm Use: Secure feed, seed, and heavy machinery protection against pests and severe weather.
  • Residential & Personal Storage: Heavy-duty, on-property storage during home remodels, relocations, or seasonal transitions.

Delivery, Logistics & Site Preparation

Big Bear Containers provides reliable, insured delivery direct to your site across the Sacramento region, Northern California, and nationwide throughout the continental United States. Depending on the unit, delivery is handled via specialized tilt-bed rollback truck or transport trailer.

  • Site Access Requirements: Ensure a clear, level surface (concrete pad, packed gravel, or asphalt) with adequate approach clearance for delivery trucks.
  • Pre-Delivery Inspection: Every unit undergoes a rigorous multi-point inspection prior to dispatch to ensure doors, seals, structural members, and flooring meet our strict quality criteria.
  • Rapid Dispatch: Local Sacramento and California deliveries typically arrive within 3 to 7 business days following order confirmation. Nationwide freight options are fully tracked.

Why Choose Big Bear Containers?

At Big Bear Containers Inc., we pride ourselves on delivering premium grade storage containers, modular structures, and commercial trailers with transparent pricing and exceptional customer care. Whether you are purchasing a single storage container or outfitting an entire commercial fleet, our Sacramento-based team is dedicated to providing durable solutions tailored to your operational needs.

  • Rigorous Inspection Guarantee: Guaranteed wind- and water-tight containers with robust structural integrity.
  • Transparent Quotes: Flat regional delivery rates shown at checkout, with no hidden handling fees.
  • Dedicated Support: Personalized assistance from container specialists from order placement to on-site drop-off.
Additional information

Additional information

Year

2024

Make

Griffin

Trailer Type

Dump Trailer

Deck Size

7 x 16

GVWR

14,000 lb

Condition

New

Delivery & Site Prep

Delivery & Site Preparation

We deliver this item locally, nationwide and internationally. Delivery is a flat rate by region – from $250.00 in the Sacramento area – and the exact rate shows at checkout. See all delivery rates. Orders are handled within 1–3 business days of payment clearing, and transit typically takes 3–7 business days. We call to confirm your delivery window before dispatch.

Get your site ready

  • Level, firm, well-drained ground – compacted gravel, concrete or railroad ties under the corners.
  • Straight, clear approach – about 75 ft for a 20ft unit and up to 100 ft for a 40ft unit, in line with the placement spot.
  • Overhead clearance – roughly 14 ft along the route, free of power lines, branches and eaves.
  • Someone on site to show the driver the exact spot and door direction.

Need a crane, forklift or placement in a tight space? Tell us before you order. Read the full Shipping & Delivery Policy or the Buyers Guide.

Reviews (0)

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.